We design every water transfer job based on customer specifications to ensure the desired flow rate is achieved with the right field technicians and equipment to deliver superior reliability and uptime. Routes, crossings, pumps, filter units, and automated monitoring and control systems are optimized for distance, elevation, logistics, and rate.
Each year, our AquaXPT™ water management division safely and reliably delivers more than 200 million barrels of water for Permian Basin drilling and frac operations. Noteworthy jobs include supplying 200 bpm to a location 7.8 miles from the water pit, supplying a 10-mile line from a water source to a drilling rig, and transferring water over a route with a 160-ft elevation climb over a 6-mile transfer.








